It happens in connection with the ring 3 / E6 closed this Saturday at 22 between Ryen and Teisen and until Monday February 22, at 5 in the morning.
Today it runs approximately 70,000 cars through the tunnel every day. Of these passes 14,000 in periods 7- 9 and the morning and 15 and 17 in the afternoon. NPRA points out that if no change travel habits, may rush hour last most of the day.
– We encourage anyone traveling through the area by car to consider other modes of travel, says Project Manager Hilde Ulvik in NPRA.
Follow Dagsavisen Oslo on Facebook!
Detour Pathways through Oslo via Svartdal tunnel and Vålerengtunellen or Mosseveien south.
– People who travel on winter Saturday 20th February and plan to pass through Bryn tunnel on the E6 through Oslo, you need to plan your journey so they arrive tunnel before at 22, says Ulvik.
From Monday February 22 at 5 there will be traffic in one run until the project is completed in summer 2017.
From before the traffic goes in one race in Smestad tunnel and Granfoss tunnel for maintenance. (NTB)
READ ALSO: So it was when Alec tunnel was closed
No comments:
Post a Comment