(Dagbladet): The broken Skjeggestad bridge on E18 at Holmestrand be blasted Saturday, said Arvid Veseth in Public Roads Administration to NRK Vestfold.
Public Roads Administration of the project, has long planned that the bridge will be blasted this week.
The bridge collapsed in dense afternoon traffic on 2 February when the ground around the bridge foundation crumbled.
– Time and details around blasting shall be determined in a construction meeting at. 14 Wednesday afternoon. Traffic on the E18 is not affected. The bypasses now, said communications manager Lars Helge Rasch Public Roads Administration to Dagbladet.
Brusprengningen be no public entertainment.
– It will be a 500-meter minimum distance audience, and the entire bridge will be covered with tarpaulin or cloth that concrete remnants will create the least possible problems for the reason, says Rasch.
Public Roads cover the bottom with about 2000 tons of Leca balls to create a soft landing on the hard ground.
No comments:
Post a Comment